Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Action

More information

Changes

Launch trench synergy request (ONLY CHANGED ON BETA ENVIRONMENT)

https://api-gateway.beta.gipod.vlaanderen.be/api/v1/groundworks/%7BgipodId%7D/trench-synergy-requests

-

https://api-gateway.test.gipod.vlaanderen.be/api-documentation.html#operation/LaunchTrenchSynergyRequest

When on the BETA environment the deadlines for a launched groundwork will no longer be the same as production.
Deadline 1 : 15 days from the DAY the groundwork trench synergy request was launched. Changes (on BETA) to 4 hours from the EXACT TIME the groundwork trench synergy request was launched.
Deadline 2 : 45 days from the DAY the groundwork trench synergy request was launched. Changes (on BETA) to 24 hours from the EXACT TIME the groundwork trench synergy request was launched.

Register a groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/RegisterGroundwork

A groundwork of category 2 or 3 can now be registered with a geometry of type Point besides Polygoon and MultiPolygoon

Modify a groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/ModifyGroundwork

A groundwork of category 2 or 3 can now be modified to a geometry of type Point besides Polygoon and MultiPolygoon

Modify the zone of groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/ModifyGroundworkZone

The zone of a groundwork of category 2 or 3 can now be modified to a geometry of type Point besides Polygoon and MultiPolygoon

Removed Calls

...