Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

New Calls


Action

More information

Modify a work

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/ModifyWork

Modify status, period, timeschedule , estimatedDurationDays, description, reference, urls, specification type and public domain occupancy type

Transfer the pilot of a trench synergy

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/TransferPilot

It is possible to transfer the pilot of a trench synergy to another organisation that is a participant of the trench synergy.

Remove contact organisation for event

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/RemoveEventContactOrganisation

It is possible to remove contact organisations from a event

Remove contact organisation for work

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/RemoveWorkContactOrganisation

It is possible to remove contact organisations from a work

Remove contact organisation for groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/RemoveGroundworkContactOrganisation

It is possible to remove contact organisations from a groudwork

Add contact organisation for event

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/AddEventContactOrganisation

It is possible to add contact organisations to a event

Add contact organisation for work

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/AddWorkContactOrganisation

It is possible to add contact organisations to a work

Add contact organisation for groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/AddGroundworkContactOrganisation

It is possible to add contact organisations to a groudwork

Changed Calls


Action

More information

Changes

Launch trench synergy request (ONLY CHANGED ON BETA ENVIRONMENT)

https://api-gateway.beta.gipod.vlaanderen.be/api/v1/groundworks/%7BgipodId%7D/trench-synergy-requests

-

https://api-gateway.test.gipod.vlaanderen.be/api-documentation.html#operation/LaunchTrenchSynergyRequest

When on the BETA environment the deadlines for a launched groundwork will no longer be the same as production.
Deadline 1 : 15 days from the DAY the groundwork trench synergy request was launched. Changes (on BETA) to 4 hours from the EXACT TIME the groundwork trench synergy request was launched.
Deadline 2 : 45 days from the DAY the groundwork trench synergy request was launched. Changes (on BETA) to 24 hours from the EXACT TIME the groundwork trench synergy request was launched.

Register a groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/RegisterGroundwork

A groundwork of category 2 or 3 can now be registered with a geometry of type Point besides Polygoon and MultiPolygoon.
It will also be possible to register in name of another organisation. As long as the organisations belongs to the same organisational structure.

Modify a groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/ModifyGroundwork

A groundwork of category 2 or 3 can now be modified to a geometry of type Point besides Polygoon and MultiPolygoon

Modify the zone of groundwork

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/ModifyGroundworkZone

The zone of a groundwork of category 2 or 3 can now be modified to a geometry of type Point besides Polygoon and MultiPolygoon

Modify a public domain occupancy

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html

Any modification made to public domain occupancy can be made by anyone in the same organisational structure as the owner of that particular public domain occupancy.

Extend list public domain occupancy types

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/GetPublicDomainOccupancyTypes

  • New item ‘Hoogtewerker’ added under ‘Werk > Bouwwerk’

  • New item ‘Reclame’ added under ‘Evenement’

  • New item ‘Uitstalling’ added under ‘Evenement’

Extend response of Groundwork detail

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/GetGroundwork

The contactinformation in detail of a Groudwork was extended to include the Contactrole

Extend response of Work detail

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/GetWork

The contactinformation in detail of a Work was extended to include the Contactrole

Extend response of Event detail

https://api-gateway.beta.gipod.vlaanderen.be/api-documentation.html#operation/GetEvent

The contactinformation in detail of a Event was extended to include the Contactrole

Removed Calls


  • No labels